Board Production

Panel Production

From a single panel, to a complete furniture set.

Modern digital workshop, full process control. Every panel is traceable from warehouse entry to on-site installation.

5 steps
Core equipment processes
100%
QR-tracked throughout
2 teams
Independent specialist teams
Same-day
Site photo reporting

Every panel,
has its digital file.

Digital Process

Digital workshop, full traceability

From panel warehouse entry to on-site installation, every step is recorded in the system — scan the code, trace the record.

01

Warehouse entry — every panel coded on arrival

Each panel gets a dedicated QR code on arrival, logged into the warehouse system and linked with ERP. Source, batch and storage location — scan to check.

Warehouse entry
02

Job splitting — one drawing, many pieces, one code each

Detail drawings are split into piece-by-piece production drawings, with dimensions, colour, drilling, edge banding, notches, handle grooves and light-strip grooves fully specified. Data goes straight to the server — a paperless flow. Every printed QR code is a “clone” of the panel once it is cut.

Board warehouse with racked panel storage
03

Smart production — a digital line, every step recorded

Material picking, CNC cutting, fully automatic heavy-duty servo laser edge banding, automatic six-sided drilling — machines are linked by roller conveyors, so semi-finished parts glide between stations: less lifting, less handling damage. Data from every process enters the system in real time.

Smart production
04

Inspection & packing — machine and human checks

Automated equipment inspection plus manual quality check — a double gate. Automatic packing, finished goods to warehouse, inspection records travel with the goods.

Inspection and packing
05

Transport & installation — clear roles, clear responsibility

The transport team handles loading, shipping and handling; goods are placed by area on site and photographed as evidence. The installation team then arrives and unpacks for inspection on the spot. Damage during transport is the transport team’s responsibility — clear accountability, full video documentation. Progress is photographed daily with timestamp cameras, and photos are reported back to the company the same day.

Transport and installation

Need a furniture solution?

Free on-site measurement — design proposals at no cost.

Contact Us